Tonstad Campus

Located at Sirdal in West Agder County (NO2), Norway, Tonstad Campus is one of Norway’s largest power-ready sites, located next to the Ertsmyra switchyard for direct high-voltage access. Tonstad Campus will comprise four purpose-built data centres designed to support HPC, cloud, and AI workloads.

300MW

Power secured

2028

First capacity live

€2.5B+

Projected investment

420K m2

Land acquired

Meet GreenScale’s Tonstad Campus

Tonstad Campus represents GreenScale’s most significant data centre development to date, offering customers extensive renewable energy capacity and scalable digital infrastructure.
Ultra-low

Ultra-low
electricity costs

Tonstad Campus benefits from Norway’s exceptionally low-carbon-intensity energy grid, with a high penetration of renewables such as hydropower and energy costs among the lowest in Europe.

Low risk country

Low-risk 

country

Low political and economic risk, with transparent regulations and strong governance. Stable, transparent economy ensures secure long-term growth.

Carrier neutral
environment

Cooling
efficiency

Norway’s climate enables energy-efficient data centre operations through ‘free-cooling’, reducing the need for mechanical cooling.  

Campus specifications

Country

Norway

Municipality

Sirdal

Town

Tonstad

Address

4440 Tonstad Norway

Zoning

Industrial

Land acquired

420,000m²

Power secured

300 MW

Annual PUE

1.2

Distance to substation

<1km

Renewable energy

Norway’s grid is 98%+ renewable

Site development

2026

Ready-for-service

2028

Connectivity

Fast, abundant, and low latency

Global links

Transatlantic connections
Coverage
US, Europe, UK & Ireland

Network type

Carrier neutral fibre
Resilience
Multiple diverse routes
Infrastructure

Options for fully diverse independently owned regional fibre rings

Home to one of Europe’s leading hydropower resources


Situated in Norway, a nation defined by its renewable energy capacity, Tonstad Campus will benefit from abundant hydropower generation. This will ensure the delivery of clean, uninterrupted energy at scale, supported by robust infrastructure, and reinforced by regulatory frameworks that prioritise long-term reliability. Combined with the site’s integration with regional network corridors, it will all amount to high-performance connectivity across European and global digital ecosystems.

Why Tonstad Campus?

Latest insights

12th February 26
Work begins at GreenScale’s Tonstad Campus as site preparation gets underway
19th January 26
Independent socio-economic analysis highlights long-term significance of Tonstad Data Centre Campus 
3rd June 25
GreenScale announces the acquisition of Tonstad DataPark in Norway to build and operate a 300MVA data centre campus in the region

Let’s accelerate your vision together

Whether you’re interested in sustainable solutions, collaboration opportunities, ethical sourcing, or advancing your digital infrastructure, we’d love to hear from you. Connect with us today and ask how we can accelerate positive change together.